GSE Composite2,842.15+1.24%GSE Financial2,156.88+0.87%GHS/USD13.85-0.32%GHS/GBP17.42-0.18%GHS/EUR15.21+0.05%Gold (USD/oz)2,318.40+0.62%Crude Oil (Brent)88.14-0.45%Cocoa (USD/t)9,240.00+2.11%GSE Composite2,842.15+1.24%GSE Financial2,156.88+0.87%GHS/USD13.85-0.32%GHS/GBP17.42-0.18%GHS/EUR15.21+0.05%Gold (USD/oz)2,318.40+0.62%Crude Oil (Brent)88.14-0.45%Cocoa (USD/t)9,240.00+2.11%
    Tuesday, November 24, 2026
    Accra 31°C
    The Executive Spotlight

    Ghana's Premier Business & Policy Journal

    General News AfricaWorldBusinessResearchSportsOpinionTechnologyPoliticsIn PicturesEntertainment The Brief
    ← Back to homepage
    Business

    From ship to factory: What port delays cost Ghana’s manufacturers

    A container can be released by Customs and still be waiting for a truck to take it out of Tema Port. As President John Dramani Mahama pushes for faster clearance, the journey from ship to factory shows where delays can arise and how the bills can mount.

    Business Desk·5 min read·19 Nov 2026
    Share
    From ship to factory: What port delays cost Ghana’s manufacturers

    Ghana’s cement manufacturers put a price on delays at Tema Port in September when their industry body announced a temporary GH¢12 surcharge on each bag of cement. The chamber said the extra charge was intended to offset the cost of ships waiting to unload clinker, a key ingredient in cement.

    For manufacturers bringing raw materials, spare parts or machinery through Tema in containers, the wait can continue after the ship has docked. A box can be in the terminal yard while a declaration is processed, an inspection is arranged or a truck is booked. Each stage has its own records, and some charges can keep running while the importer waits.

    President John Dramani Mahama has asked Trade Minister Elizabeth Ofosu-Adjare and Transport Minister Joseph Bukari Nikpe to tackle port delays. At the 22nd Ghana Club 100 Awards, he said: “We should be able to take a container out of the port in hours, not days.” He linked faster movement of goods to Ghana’s ability to compete under the African Continental Free Trade Area.

    From the ship to the gate

    Some of the paperwork can be done before the ship arrives. The Ghana Revenue Authority (GRA) says a clearing agent can submit an import declaration through the Integrated Customs Management System, known as ICUMS, before or after arrival. Customs determines how the goods are classified and valued, and the agent pays the assessed duties and taxes. The consignment may also require a permit from another regulator, depending on what is inside.

    Once the ship berths, the terminal operator unloads the container. What happens next depends in part on how Customs assesses the risk of the shipment. Some consignments undergo a physical examination, while others are scanned or released through the gate under the applicable checks. Where an examination is required, the container has to be positioned so officers can inspect it.

    At Tema’s Terminal 3, operator Meridian Port Services says importers or their agents must obtain both Customs and shipping-line releases before applying to the terminal for delivery. The haulier then has to collect the container, and the consignment goes through security checks at the exit gate. The Customs release and the truck’s departure are two events that can be timed separately.

    In July, importers told a Ghana Shippers’ Authority committee that containers destined for inland depots were taking too long to be moved from Terminal 3.

    They said the wait disrupted their operations while rent and other time-related charges continued to accrue. For those shipments, the transfer itself was another point at which time could be lost.

    What the clock measures

    A GRA time-release study reported in 2024 found that cargo at Tema took an average of nearly 11 days from vessel berthing to release from Customs control.

    The study’s historical benchmark includes time before the declaration was filed. It measures neither the time a vessel spent waiting offshore nor the full journey to the factory.

    There is a separate question about how long the container stays in the terminal after it is unloaded. That interval matters to an importer because some charges are tied to the day of discharge. Getting the box through the gate can stop one bill while another clock keeps running until the empty container is returned.

    Who pays for the wait?

    Terminal storage is charged for keeping the container in the yard under the applicable tariff. A shipping line may charge demurrage for keeping its container at the terminal beyond the allotted free time, and detention for keeping it too long after collection. Some carriers apply a combined period.

    A haulier may also bill for truck waiting under its transport agreement. The invoice and contract determine which charges apply to a particular shipment.

    Maersk’s published Ghana schedule illustrates how a bill can build. It lists seven free days for a standard dry container delivered within Ghana and a charge of US$20 a day for a 20-foot container from day eight to day 16.

    Three chargeable days in that band would add US$60 in shipping-line charges alone. The line measures the period from discharge through empty return. The calculation illustrates one published tariff, and an importer’s actual bill depends on the booking terms and any other charges.

    The cost can also reach the factory floor. If a delayed shipment contains a spare part needed to restart a machine, the port invoice captures only part of the financial effect.

    A manufacturer would need production records to show how much output was lost, or purchase records to show what it paid for emergency supplies.

    Public records reviewed for this feature did not establish a total delay cost in cedis for an individual manufacturing container.

    The GH¢12 cement surcharge shows one way manufacturers sought to pass on costs from congestion. It arose from bulk clinker vessels waiting to berth and unload.

    Container importers face a different set of charges, and the surcharge does not establish what they paid or how much of their costs reached consumers.

    How businesses will know if clearance is faster

    The Transport Ministry said in September that Mr Nikpe had discussed speeding up inspections and clearance with Meridian Port Services. The president’s directive puts renewed attention on that work. For manufacturers, the test will be whether inputs reach factories sooner and whether bills for storage, shipping-line charges and truck waiting fall.

    Publishing comparable times for berthing to Customs release and discharge to gate exit would show where progress is being made and where containers are still held up.

    Enjoyed this article?
    Share

    The Daily Brief — Delivered to Your Inbox

    Get the top 5 stories from Ghana and West Africa every morning. Free, concise, no spam.

    The Executive Spotlight

    Accra, Ghana · © 2026

    Sections

    • General News
    • Africa
    • World
    • Business
    • Research
    • Sports
    • Opinion
    • Technology
    • Politics
    • In Pictures
    • Entertainment
    • The Brief

    Services

    • Subscribe
    • Newsletters
    • Podcasts
    • Events
    • Corporate Access

    About

    • Contact Us
    • Careers
    • Advertise
    • Privacy Policy
    • Terms of Service

    More on Business

    Ghana hostel developers can spend up to 30 years repaying loans, industry group says
    Business

    Ghana hostel developers can spend up to 30 years repaying loans, industry group says

    Ama Owusu
    Suame Magazine traders reportedly move to lock shops in spare parts dispute
    Business

    Suame Magazine traders reportedly move to lock shops in spare parts dispute

    Kofi Boateng
    Bank of Ghana cuts overnight lending rate for banks from 18% to 12%
    Business

    Bank of Ghana cuts overnight lending rate for banks from 18% to 12%

    Business Desk